


{"id":2917,"date":"2018-08-30T06:40:38","date_gmt":"2018-08-30T06:40:38","guid":{"rendered":"https:\/\/www.engenhariacivil.com\/pro\/?p=2917"},"modified":"2018-08-30T06:40:38","modified_gmt":"2018-08-30T06:40:38","slug":"kone-ganha-contrato-para-fornecimento-de-elevadores-da-linha-2-do-metro-de-wuxi","status":"publish","type":"post","link":"https:\/\/www.engenhariacivil.com\/pro\/kone-ganha-contrato-para-fornecimento-de-elevadores-da-linha-2-do-metro-de-wuxi-201808300640382917","title":{"rendered":"Kone ganha contrato para fornecimento de elevadores da Linha 2 do Metro de Wuxi"},"content":{"rendered":"<p><a href=\"https:\/\/www.engenhariacivil.com\/pro\/f\/2018\/08\/130549.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2918\" src=\"https:\/\/www.engenhariacivil.com\/pro\/f\/2018\/08\/130549-900x420.jpg\" alt=\"\" width=\"900\" height=\"420\" srcset=\"https:\/\/www.engenhariacivil.com\/pro\/f\/2018\/08\/130549.jpg 900w, https:\/\/www.engenhariacivil.com\/pro\/f\/2018\/08\/130549-540x252.jpg 540w, https:\/\/www.engenhariacivil.com\/pro\/f\/2018\/08\/130549-768x358.jpg 768w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/a><\/p>\n<p class=\"hs1\">KONE, a global leader in the elevator and escalator industry, has won an order to equip line 3 of the Wuxi Metro in the southern part of China&#8217;s Jiangsu Province. The deal builds on KONE&#8217;s previous contribution to line 2 of the Wuxi Metro.<\/p>\n<p class=\"hs1\">Line 3 of the Wuxi Metro runs 28.5 kilometers in a southeastern direction, starting at the Su Temple in the northwest, and ending at the Shuo Fang International Airport in the south. All 21 stations along the line are situated underground.<\/p>\n<p class=\"hs1\">KONE will supply the metro line with 99 KONE TransitMaster(TM) 140 heavy-duty escalators designed specifically to meet the special requirements of metro projects in China, an important infrastructure market for KONE. The escalators have a maximum transport capacity of 7,300 people per hour.<\/p>\n<p class=\"hs1\">&#8220;Wuxi is also known as &#8216;little Shanghai&#8217; thanks to its fast pace of urbanization and booming economy. It is a pleasure to help commuters and visitors to this vibrant city move around smoothly and safely,&#8221; says William B. Johnson, executive vice president, KONE Greater China.<\/p>\n<p class=\"hs1\">Trial operations are expected to start in mid-2020. The main developer of the project is Wuxi Metro Group Co., Ltd., and the architects are Guangzhou Metro Design &amp; Research Institute Co., Ltd.<\/p>\n<p class=\"hs1\">The order was booked in the second quarter of 2018.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KONE, a global leader in the elevator and escalator industry, has won an order to equip line 3 of the Wuxi Metro in the southern part of China&#8217;s Jiangsu Province. The deal builds on KONE&#8217;s previous contribution to line 2 of the Wuxi Metro. Line 3 of the Wuxi Metro runs 28.5 kilometers in a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2918,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2917","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/posts\/2917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/comments?post=2917"}],"version-history":[{"count":1,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/posts\/2917\/revisions"}],"predecessor-version":[{"id":2919,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/posts\/2917\/revisions\/2919"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/media\/2918"}],"wp:attachment":[{"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/media?parent=2917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/categories?post=2917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engenhariacivil.com\/pro\/wp-json\/wp\/v2\/tags?post=2917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}